Year: 2019
Contingency Estimation based on Risk Events of Tunnel Construction: Case study Nam Thuen 1 Hydropower Project
Paijit Pawan and Thammasak Rujirayanyong
Pages: 364-374
Keywords: Monte Carlo Simulation, Tunnel Construction, Precedence Diagramming Method (PDM), Risk
Doi: 10.14458/RSU.res.2019.54