RSU International Research Conference 2019

Year: 2019

Contingency Estimation based on Risk Events of Tunnel Construction: Case study Nam Thuen 1 Hydropower Project

Paijit Pawan and Thammasak Rujirayanyong

Pages: 364-374

Keywords: Monte Carlo Simulation, Tunnel Construction, Precedence Diagramming Method (PDM), Risk

Download full paper.

Doi: 10.14458/RSU.res.2019.54